One lead developer, two agencies, and no CTO.

You have one lead developer who built the core system, two agencies who build the rest, and no CTO. The question you keep asking is who owns the roadmap, and the honest answer is nobody does. That is the problem, not the suppliers. The fix is to put one technical owner over the whole thing, with the mandate to grade both agencies and decide the seams between their systems. It is usually a few days a month, and it almost never means replacing every supplier.

What you have probably noticed

Every missed date has two explanations, one from each agency, and they point at each other. The work that sits between the two systems, the part where one agency's output becomes the other's input, is late in a way nobody can quite pin down. Your lead developer is the only person who understands both sides, so he spends his week reviewing work he has no authority to reject, answering integration questions for both suppliers, and building the pieces neither agency will touch. The roadmap, if you can call it that, is two backlogs that do not add up to a plan. And the one meeting where both agencies are in the room ends with actions for your lead and none for them.

The tell is the blame. When something breaks at the join between the two systems, each supplier has a clean, honest account of why it is the other one's fault. Both accounts are usually true. That is the signal that you are not looking at a quality problem. You are looking at a role that does not exist.

What it actually means

You are asking one person to do three jobs with the authority to do none of them. He is the builder, the reviewer of two suppliers, and the integration point between them, and he was given none of those mandates on paper. Meanwhile the thing that is genuinely missing is ownership of the seam: the contract between the two systems, the order in which the two agencies ship, and the single roadmap that spans both. Each agency can be perfectly competent inside its own scope and the whole can still fail, because the join is nobody's scope.

That missing role is a CTO's. Not the part people picture, the architecture diagrams and the hiring. The unglamorous part: deciding who builds what, where the systems meet, and whose date moves when two of them collide. You do not have anyone doing that, so it defaults to the lead developer, who cannot tell an agency its scope was wrong because he does not own the contract, or to you, who cannot read the work well enough to adjudicate. This is the same gap the accidental software company runs into, arrived at from a different direction: not one system that grew too big to own, but two suppliers that grew too far apart to coordinate.

What to do about it, without firing your suppliers

The instinct is to collapse to one agency so there is one throat to choke. Sometimes that is right. More often it trades a coordination problem for a lock-in problem and costs a rebuild to get there. Try this order first.

  1. Name one technical owner with a real mandate. One person owns the roadmap across both agencies and holds the authority to accept or reject either supplier's work. Often that person is already inside: the lead developer who understands both systems. Promote him, give him the title and the pay step, and take building off his plate so he can own instead of code. If he cannot step up or does not want the job, a fractional CTO holds the seat a few days a month while you decide, rather than leaving it empty.
  2. Make the seam someone's explicit job. One roadmap, not two backlogs: a short list of what the combined system must do in the next two quarters and in what order the two agencies ship to get there. One architecture authority who decides the interface between the two systems and settles whose date moves when they collide. The owner above does this, or signs off on it. The seam stops being the place where work disappears once it is written down as somebody's responsibility.
  3. Grade both agencies against outcomes, then decide. Someone has to read both contracts and both codebases in the same fortnight and say which supplier is actually delivering. Rewrite the scopes to pay for outcomes instead of named profiles and billed hours. Usually one agency is the problem and one is fine. You keep the one that delivers, hold the other to a rewritten scope, and replace only the supplier that still misses once the seam is owned and the scope is clear. That is a scalpel, not the rip-and-replace the first instinct reaches for. In one case I wrote up, the fix was one promotion and one renegotiated contract, not a new set of suppliers.

None of this requires a full-time hire or a new platform team. It requires a few days a month of oversight from someone who has owned software before, which is the shape of work the SME practice is built for. Most companies in this position are one promotion and one rewritten scope away from a roadmap they can actually read.

When this is fine, and when not to overcorrect

Two agencies is not automatically a problem. If one supplier clearly owns the whole stack, delivers against outcomes, and your lead developer has the authority and the time to grade the work, you have a structure, not a gap. Two suppliers with a clean interface and one owner over both is a normal, healthy setup. The problem is the ownership vacuum, not the vendor count.

The overcorrection cuts the other way, and it is expensive. An owner who has just felt this pain will sometimes hire a full-time CTO, stand up an internal team, and start pulling work back in-house for a problem that needed one owner and two rewritten contracts. A full-time interim CTO is the right call for a narrower case: delivery has already stopped, the internal lead is leaving, or a restructuring is coming and you want it run by someone without history in the building. For everything short of that, match the leadership to the gap. The gap here is ownership of the seam, and that is a few days a month, not a new hire and a rebuild.

Frequently asked

Who owns the roadmap when you have agencies but no CTO?

Nobody does, and that is the problem. With one internal lead developer and two agencies, each supplier owns its own backlog, the lead owns the glue, and the decisions that span both systems wait for a meeting that never resolves. The roadmap is two backlogs that do not add up. The fix is to give one named person the mandate to own the roadmap across both suppliers and to decide the interface between the two systems. That role is a CTO's, whether it is filled full-time, by a promoted lead, or by a fractional CTO a few days a month.

Do I need to replace my agencies if they keep missing dates?

Usually not both. When two agencies each miss dates and blame the other, the fault is often the seam between them that nobody owns, not the quality of either one. Before you fire anyone, put one technical owner over the whole thing to grade both agencies against outcomes. Most of the time one supplier is the problem and one is fine. You keep the one that delivers, rewrite the other's scope to pay for outcomes, and replace only if that fails. Replacing every supplier is slower, more expensive, and usually unnecessary.

Should I promote my lead developer to CTO?

Often yes, with two conditions. Give them the title, the pay step, and real authority to reject a supplier's work, and take building off their plate so they can actually own the roadmap instead of coding full-time. A capable insider who already understands both the code and the business beats an outside hire who has to learn it first. If the lead cannot step up or does not want the job, a fractional CTO holds the seat for a few days a month while you decide, rather than leaving the role empty.

Do I need a full-time CTO for this, or is fractional enough?

Fractional is usually enough. Owning a roadmap across two agencies, grading their work, and deciding the architecture between two systems is a few days a month of senior oversight, not a full-time job, unless the software is the product and the roadmap is large enough to keep a leader busy. A full-time CTO is right when delivery has to accelerate hard, the internal lead is about to leave, or a restructuring is coming. For most owner-led SMEs, a few days a month plus a promoted internal owner closes the gap.


Written from patterns I've seen across engagements. If any of it sounds too specific to be general, that's why.